Umweltbundesamt (Ministry for the Environment)

Location

Dessau-Roßlau/ Germany

Principal Use

Office

Design Architect

Matthias Sauerbruch, Louisa Hutton Juan Lucas Young, Jens Ludloff

Anything about the engineers? Facade consultants?

Krebs e Kiefer

Gross Floor Area

41,000 m2 Units SI IP

441,324 ft2

Building Name

Umweltbundesamt (Ministry for the Environment)

Address

Wörlitzer Pl. 1, 06844 Dessau-Roßlau, Germany

Description / Additional Information

Describe the key innovation and technology aspects of the project

Project Narrative

The Offices for the Federal Environmental Agency present a case study for sustainable building. Active and passive strategies for the reduction of energy consumption and carbon dioxide production are realised in an architecture that combines spatial and material economy with a deliberate stimulation of the senses. Combines a compact volume and a high degree of thermal insulation with strategies of intelligent engineering and the use of renewable energy sources. In particular, it benefits from the use of a large geothermal heat exchange system and solar panels.

General Information

Year completed (or major renovation)

2005

Construction Cost

81000000

Climate Zone

Temperate

Building Certifications (check all that apply)

  • DGNB Certificate ‘Gold’

External Links

Link(s) for more information

Other Design Features

Energy Performance

Construction Type

Main Cladding Material

  • Glass
  • Wood

Skin Type

Skin Type

  • Double Skin Facade

Geometrical configuration

  • Box Window

Ventilation type

  • Indoor Air Curtain

Solar Shading

Solar Shading Strategy

  • Dynamic Exterior Shading

Exterior shading

  • Exterior Movable Louvers or Blinds

Glazing-integrated shading

  • Dynamic Microlouvers

Ventilation

Is there natural ventilation through the facade?

No

Type of Ventilation Strategy

  • Double sided

Relationship to Mechanical Systems

  • Alternative (when natural vent is on mechanical is off)

Ventilation Operation Type

  • BMS controlled with overrides

Ventilation Control Strategy

  • Based on Outdoor Air Temperature

Daylight

Is daylight simulation part of the design process?

No

Noise

Embodied Carbon

Was a carbon assesment of the facade conducted in the design phase?

Yes

Energy Generation

Does the facade produce energy?

No

Insulation

Does the facade have a dynamic U-value?

No

Monomaterial envelope?

No

Description / Additional Information