CBE Facade Map

Supporting the adoption of advanced facade design strategies and technologies

Select Page

Map

Shareable post

Council House 2 (CH2)

Location

Melbourne, Victoria, Australia

Principal Use

Institutional

Design Architect

DesignInc (Mick Pearce)

Anything about the engineers? Facade consultants?

DesignInc Melbourne; Lincolne Scott (services engineer)

Gross Floor Area

12,500 m2 Units SI IP

134,550 ft2

Reason(s) for inclusion

Building Name

Council House 2 (CH2)

Address

240 Little Collins Street, Melbourne VIC 3000, Australia

Description / Additional Information

Describe the key innovation and technology aspects of the project

Project Narrative

The north and west facades use a multi-system active envelope: computer-controlled hydraulic timber louvers made of recycled hardwood track solar angles throughout the day. The west face features precast concrete blade fins for thermal mass shading, and the east face uses perforated metal screens. The integrated facade strategy reduced energy use by 87% versus a standard building. First to achieve 6-Star Green Star in Australia.

General Information

Year completed (or major renovation)

2006

Construction Cost

38000000

Climate Zone

Temperate

Building Certifications (check all that apply)

  • Green Star (Australia)
  • Green Star 6-Star Office Design v1 — Australia's first

External Links

Link(s) for more information

Other Design Features

Energy Performance

Construction Type

Construction Type

  • Frame Facade Construction

Prevalent Glazing Type

  • Double Glazing

Main Cladding Material

  • Other (please specify)

Skin Type

Skin Type

  • Another skin

Solar Shading

Solar Shading Strategy

  • Static Exterior Shading

Ventilation

Is there natural ventilation through the facade?

Yes

Type of Ventilation Strategy

  • Stack or Atrium-enabled

Daylight

Is daylight simulation part of the design process?

Yes

Noise

Embodied Carbon

Energy Generation

Insulation

Description / Additional Information